Ok...Almost done. I still need to have the cupboard doors installed. Today the crown moulding was installed. All I need is some baseboards, schoolhouse lighting, a dishwasher(that takes a hidden panel), counter tops, bottom piece of window trim, door trim for dining room, and a swinging dining room door.
Tuesday, April 26, 2011
Friday, April 1, 2011
Master bedroom renovation
This is only the beginning of a very tedious process of the master bedroom renovation. My deadline for completion is June 25, 2011. My fiance and I will be married that day and that is when she will move in.
The celing tiles are the first things to go. After I remove the tiles, I have to take down the templates used to secure the tiles on the celing. That can be a pain because they are nailed into the joists above the lathe and plaster. Once I get that done with, I will carefully remove the picture rails, window trim, baseboards, and door frames.
The celing tiles are the first things to go. After I remove the tiles, I have to take down the templates used to secure the tiles on the celing. That can be a pain because they are nailed into the joists above the lathe and plaster. Once I get that done with, I will carefully remove the picture rails, window trim, baseboards, and door frames.
Subscribe to:
Posts (Atom)